United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Umbra Solar II

Umbra Solar II is a 345 MW solar request withdrawn in the ERCOT interconnection queue, in Franklin County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2023 (completed)
  2. Withdrawn / abandonedDec 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0437
Grid region
ERCOT (Texas)
Developer
Saddle House Solar Project, LLC
Connection point (POI)
tap 345kV 1695 Monticello -11699 Woodard
Location
Franklin County, Texas
Technology
Solar: 345 MW
Total requested
345 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
27 June 2023
Proposed online date
April 2027
Withdrawn
December 2025

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem