Solar project GEN-2023-241, Franklin County

Solar project GEN-2023-241, Franklin County is a 93.0 MW solar request in interconnection study in the SPP interconnection queue, in Franklin County, Texas, connecting to AEP.

Queue statusIn planning
  1. PlanningQueued Oct 2023 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
GEN-2023-241
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
AEP
Connection point (POI)
Winnsboro 138 kV Substation
Location
Franklin County, Texas
Technology
Solar: 93.0 MW
Total requested
93.0 MW
Service type
Energy only (ERIS)
Study phase
FACILITY STUDY STAGE
Queue status
Active
Entered queue
2 October 2023
Proposed online date
April 2029

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem