BATTERY STORAGE Β· ERCOTUmbra BESS II
Umbra BESS II is a 150 MW battery storage request withdrawn in the ERCOT interconnection queue, in Franklin County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2023 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 24INR0438
- Grid region
- ERCOT (Texas)
- Developer
- Saddle House Solar Project, LLC
- Connection point (POI)
- tap 345kV 1695 Monticello -11699 Woodard
- Location
- Franklin County, Texas
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 27 June 2023
- Proposed online date
- April 2027
- Withdrawn
- December 2025
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Lupinus Solar 2Solar + storage Β· 242 MW Β· agreement signed
- Lupinus Solar 1Solar + storage Β· 162 MW Β· agreement signed
- Lupinus Storage 2Solar + storage Β· 125 MW Β· agreement signed
- Lupinus Solar 3Solar + storage Β· 101 MW Β· agreement signed
- Lupinus Storage 3Solar + storage Β· 50.9 MW Β· agreement signed
- Prairie Ridge (Gas - CC)Gas Β· 1,660 MW Β· in study
- Lazy Frog Solar SLFSolar + storage Β· 100 MW Β· in study
- Solar project GEN-2023-241, Franklin CountySolar Β· 93.0 MW Β· in study
- Lupinus Storage 1Solar + storage Β· 84.0 MW Β· in study
- Umbra (Stockyard) SolarSolar Β· 208 MW Β· suspended
- Umbra (Stockyard) BESSBattery storage Β· 73.0 MW Β· suspended
- Umbra Solar IISolar Β· 345 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem