United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA — page 3
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Euismod Solar + storage |
1,247 MW | Agreement signed |
| Limitless Energy Hub I Gas · Limitless Energy Hub I LLC |
1,238 MW | In study |
| Limitless Energy Hub II Gas · Limitless Energy Hub II LLC |
1,238 MW | In study |
| Southeast Oklahoma Pumped Storage Other · Apex Energy Solutions, LLC |
1,232 MW | In study |
| Replacing 464.5 MW Steam/Gas with 97.8 MW Steam; DOW Chem Gas |
1,232 MW | In study |
| Potentia-Viridi Other |
1,225 MW | Agreement signed |
| Matterhorn Other |
1,218 MW | In study |
| Solstice B Solar + storage |
1,211 MW | In study |
| Red Oak Ridge Energy Center Gas · Invenergy |
1,211 MW | In study |
| Gas project E0016, Calumet County Gas · Invenergy |
1,211 MW | In study |
| Wolf Bone North Energy Center Gas · NRG Wolf Bone Energy Center LLC |
1,204 MW | In study |
| Gas project J4164, Dane County Gas |
1,203 MW | In study |
| Gas project J4165, Kenosha County Gas |
1,203 MW | In study |
| Gas project J4014, Calumet County Gas |
1,203 MW | In study |
| SouthCoast Wind 1 Offshore wind |
1,200 MW | Agreement signed |
| Solar project G0678, Morrow County Solar |
1,200 MW | In study |
| Bay State Wind 4 Offshore Wind Offshore wind |
1,200 MW | Agreement signed |
| Solar + storage project G0615, Sherman County Solar + storage |
1,200 MW | In study |
| Solar + storage project IC-942, Glynn County Solar + storage |
1,200 MW | Paused / redesign |
| Battery storage project G0608, Klickitat County Battery storage |
1,200 MW | In study |
| Solar + storage project Q105, Millard County Solar + storage · Intermountain Power Agency |
1,200 MW | In study |
| Spectra Solar Solar · SE DC Devco |
1,200 MW | In study |
| Corvette Wind Onshore wind |
1,200 MW | Paused / redesign |
| Other project G0787, Wasco County Other |
1,200 MW | In study |
| Solar + storage project G0702, Crook County Solar + storage |
1,200 MW | In study |
| Aviation Gas |
1,200 MW | In study |
| Eagle Pines Gas Gas · FGE Power |
1,174 MW | In study |
| Pion Battery storage |
1,168 MW | In study |
| Replace 1163.3 MW of Sabine Units 3, 4 & 1 with 2 on 1 Combined Cycle Gas Turbine facility; Sabine 1 Gas |
1,166 MW | In study |
| Gas project J955, Sangamon County Gas |
1,165 MW | Under construction |
| Gas project J3941, Deuel County Gas |
1,144 MW | In study |
| Replacement; Oak Creek Units 5-8 Gas |
1,138 MW | In study |
| Gas project 257, Shelby County Gas |
1,132 MW | Agreement signed |
| Aurelius Solar Solar · IP Roman, LLC |
1,124 MW | Agreement signed |
| Battery storage project AI2-457, Charles County Battery storage |
1,122 MW | In study |
| Nuclear project G0998, Benton County Nuclear |
1,120 MW | In study |
| Solstice A Solar + storage |
1,111 MW | In study |
| Bastrop Peaking Generators (TEF-Due Diligence) Gas · MPH Bastrop Peakers, LLC |
1,104 MW | Agreement signed |
| Gas project G0501, Klamath County Gas |
1,100 MW | In study |
| Malden CCGT Gas · NIPSCO |
1,090 MW | In study |
| Mosey Solar + storage |
1,081 MW | Agreement signed |
| Hillside Energy Storage Battery storage |
1,065 MW | In study |
| Musketeers Solar + storage |
1,047 MW | In study |
| Gas project GEN-2024-341, Pittsburg County Gas |
1,045 MW | In study |
| Zeus Armstrong BESS Solar + storage · Armstrong BESS, LLC |
1,043 MW | In study |
| Zeus Scurry BESS Solar + storage · Zeus Scurry BESS |
1,043 MW | In study |
| Zeus Mitchell BESS II Solar + storage · Zeus Mitchell BESS II, LLC |
1,043 MW | In study |
| Zeus Mitchell BESS Solar + storage · Mitchell BESS |
1,043 MW | In study |
| Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2 Gas |
1,040 MW | In study |
| Oberon Solar + storage |
1,037 MW | Agreement signed |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)