United States › Grid › Interconnection queues › Indiana

GAS · MISO

Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2

Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2 is a 1,040 MW gas request in interconnection study in the MISO interconnection queue, in Vermillion County, Indiana, connecting to DUKE ENERGY INDIANA.

Queue statusIn planning
  1. PlanningQueued Feb 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
R1044
Grid region
MISO (Midcontinent)
Utility / transmission owner
DUKE ENERGY INDIANA
Connection point (POI)
Cayuga Steam Station Switchyards 230kV and 345kV
Location
Vermillion County, Indiana
Technology
Gas: 1,040 MW · Other
Total requested
1,040 MW
Service type
Network resource (NRIS)
Queue status
Active
Entered queue
6 February 2024
Proposed online date
March 2028

Location

Marker shows the centre of Vermillion County; the queue data does not give exact sites.

Power plants in Indiana · Transmission lines in Indiana

Other requests in Vermillion County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem