United States βΊ Grid βΊ Interconnection queues βΊ Indiana
GAS Β· MISOGas project J802, Vermillion County
Gas project J802, Vermillion County is a 1,244 MW gas request withdrawn in the MISO interconnection queue, in Vermillion County, Indiana, connecting to Duke Energy Corporation.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2017 (completed)
- Withdrawn / abandonedMay 2018 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J802
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- Duke Energy Corporation
- Connection point (POI)
- Cayuga 345 kV Substation
- Location
- Vermillion County, Indiana
- Technology
- Gas: 1,244 MW
- Total requested
- 1,244 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: GIA; Post GIA Status: Not Started
- Queue status
- Withdrawn
- Entered queue
- 16 June 2017
- Proposed online date
- September 2020
- Withdrawn
- May 2018
Location
Marker shows the centre of Vermillion County; the queue data does not give exact sites.
Other requests in Vermillion County
- Solar project J1348, Vermillion CountySolar Β· 200 MW Β· agreement signed
- Gas project J3999, Vermillion CountyGas Β· 1,540 MW Β· in study
- Replacing 1014.7 MW of coal generation with Gas/Steam; Cayuga CC1 CC2Gas Β· 1,040 MW Β· in study
- Gas project J3232, Vermillion CountyGas Β· 500 MW Β· in study
- Solar project AH2-257, Vermillion CountySolar Β· 400 MW Β· in study
- Vermilion Grove WindOnshore wind Β· 255 MW Β· in study
- Solar project J1518, Vermillion CountySolar Β· 185 MW Β· in study
- Solar + storage project AH2-153, Vermillion CountySolar + storage Β· 180 MW Β· in study
- Solar + storage project AH2-154, Vermillion CountySolar + storage Β· 150 MW Β· in study
- Solar + storage project AG2-126, Vermillion CountySolar + storage Β· 150 MW Β· in study
- Solar project AI2-161, Vermillion CountySolar Β· 48.0 MW Β· in study
- Gas project J434, Vermillion CountyGas Β· 1,185 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem