🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in the USA — page 115

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9,1872,001.0 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9,187 requests · page 115 of 184
ProjectCapacityStatusLocationRegionQueuedOnline
Toland Renewable Energy Park
Onshore wind
108 MWIn study Solano, CACAISO Apr 2023target 2029
Union Ridge Solar
Solar
108 MWAgreement signed Licking, OHPJM Feb 2020target 2026
SR Norwood Solar
Solar
107 MWUnder construction Warren, GASoutheast May 2023target 2026
Comanche Creek generating station
Gas · Longfellow Power LLC
107 MWIn study Pecos, TXERCOT Jul 2024target 2027
Wittig Solar
Solar · Greenalia Solar Power Wittig LLC
107 MWIn study Wharton, TXERCOT Feb 2024target 2027
Frio Farm
Solar · PREMIER ENGINEERING USA CORP.
107 MWIn study Frio, TXERCOT Dec 2021target 2026
Fort Duncan BESS
Other · Fort Duncan BESS LLC
106 MWPaused / redesign Maverick, TXERCOT Aug 20212025
Summer Shade Solar
Solar + storage · Summer Shade Solar, LLC
106 MWAgreement signed Metcalfe, KYPJM Sep 2020target 2028
Photon Solar 4 SLF
Solar · GulfStar Power, LLC
106 MWIn study Wharton, TXERCOT Sep 2024target 2026
Battery storage project AH2-375, Stephenson County
Battery storage
106 MWIn study Stephenson, ILPJM Mar 2022target 2027
Shady Oaks Wind Power Project
Onshore wind
106 MWAgreement signed Lee, ILPJM Mar 2018target 2027
Santa Monica Solar
Solar · Karol Solar IV
106 MWIn study Navarro, TXERCOT Sep 2023target 2028
Solar project J2639, Bradley County
Solar
106 MWIn study Bradley, ARMISO Sep 2022target 2025
Benton Solar II
Solar · Xcel Energy
106 MWIn study Benton, MNMISO Aug 2025target 2028
Solar project J2634, Ouachita County
Solar
106 MWIn study Ouachita, ARMISO Sep 2022target 2025
Longfellow BESS II
Solar + storage · CENTURY GAS PROCESSING, LLC
106 MWAgreement signed Pecos, TXERCOT Nov 2022target 2026
McClure Solar
Solar · McClure Solar LLC
106 MWIn study Palo Pinto, TXERCOT Jun 2020target 2025
Rain Lily Storage 1
Solar + storage · Rain Lily Storage One, LLC
106 MWIn study Hood, TXERCOT Feb 2025target 2028
Waterloo BESS 1
Solar + storage · Waterloo Solar, LLC
106 MWAgreement signed Bastrop, TXERCOT May 2023target 2027
Burgos Solar
Solar · Twin Oaks Solar, LLC
106 MWIn study Milam, TXERCOT Oct 2022target 2027
Reis Solar
Solar · Greenalia Solar Power Reis LLC
106 MWIn study Atascosa, TXERCOT Jun 2022target 2027
Voyager Energy Storage
Battery storage
105 MWIn study Kern, CACAISO Apr 2023target 2027
Carolina Storage Friendswood
Battery storage · CSE Storage, LLC
105 MWIn study Brazoria, TXERCOT Feb 2024target 2027
Solar project J2693, Franklin Parish County
Solar
105 MWIn study Franklin Parish, LAMISO Sep 2022target 2027
Solar project J3857, Iosco County
Solar
105 MWIn study Iosco, MIMISO Dec 2024target 2030
Solar project IC-1136, Lincoln County
Solar
105 MWPaused / redesign Lincoln, GASoutheast Apr 2023target 2027
Solar project AI1-021, Pittsylvania County
Solar
105 MWIn study Pittsylvania, VAPJM Apr 2022target 2027
Solar project G0527, Lake County
Solar
105 MWIn study Lake, ORWest Feb 2016target 2019
Ulua
Battery storage
105 MWIn study Los Angeles, CACAISO Apr 2023target 2029
Solar project J3081, Hot Spring County
Solar
105 MWIn study Hot Spring, ARMISO Jul 2025target 2026
Flying Kite Bess
Solar + storage · Flying Kite BESS, LLC
105 MWIn study Zavala, TXERCOT Jul 2024target 2027
Slate Solar Project
Solar · Ignis TX Solar Three LLC
105 MWIn study Zapata, TXERCOT Dec 2021target 2027
Bonham Storage SLF
Solar + storage · J&J Solar Ranch LLC
105 MWIn study Limestone, TXERCOT Jan 2025target 2027
Starlight Storage
Solar + storage · Mills Tx Solar LLC
105 MWIn study Mills, TXERCOT Feb 2024target 2027
Yellow Leaf Solar
Solar + storage · Lightsource Renewable Energy Development LLC
105 MWIn study Kaufman, TXERCOT Apr 2025target 2028
Happy Dog Storage
Solar + storage · Rosula Solar LLC
105 MWAgreement signed Milam, TXERCOT Jun 2023target 2027
Stargazer BESS
Solar + storage · Stargazer Solar LLC
105 MWIn study Brazoria, TXERCOT Oct 2023target 2027
Neutron Storage
Battery storage · Elawan Neutron Storage, LLC
105 MWAgreement signed Mclennan, TXERCOT Sep 2023target 2028
Carolina Storage Young County
Battery storage · CSE Storage, LLC
105 MWIn study Young, TXERCOT Feb 2024target 2028
Big River Solar
Solar + storage · Rio Grande River Solar LLC
104 MWIn study Zapata, TXERCOT May 2021target 2028
Power Lane II Gas
Gas · GEUS
104 MWIn study Hunt, TXERCOT Jun 2025target 2027
Cadet Storage
Battery storage · TX BESS 5, LLC
104 MWIn study Brazos, TXERCOT May 2023target 2026
Battery storage project E0004, Saginaw County
Battery storage · Hackett Energy Storage LLC
104 MWIn study Saginaw, MIMISO Aug 2025target 2027
Gas project ERAS-2025-001, Lancaster County
Gas
104 MWIn study Lancaster, NESPP Sep 2025target 2029
Gas project Company 258, Clark County
Gas
104 MWPaused / redesign Clark, NVWest Sep 2023target 2027
Hardeman BESS
Battery storage · Quanah BESS LLC
104 MWIn study Hardeman, TXERCOT May 2024target 2028
Mineral Springs BESS
Battery storage · Burnet County LLC
104 MWIn study Burnet, TXERCOT Jun 2024target 2026
Fudge Ranch BESS
Battery storage · Crandall BESS LLC
104 MWIn study Kaufman, TXERCOT Apr 2024target 2027
Rockpile Storage
Battery storage · Rockpile Storage, LLC
104 MWIn study Frio, TXERCOT Apr 2025target 2029
Yellow Leaf BESS
Solar + storage · Lightsource Renewable Energy Development LLC
104 MWIn study Kaufman, TXERCOT Apr 2025target 2028
Page 115 of 184

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)