United States › Grid › Interconnection queues › Texas
GAS · ERCOTPower Lane II Gas
Power Lane II Gas is a 104 MW gas request in interconnection study in the ERCOT interconnection queue, in Hunt County, Texas.
Queue statusIn planning
- PlanningQueued Jun 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2027 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 27INR0489
- Grid region
- ERCOT (Texas)
- Developer
- GEUS
- Connection point (POI)
- Tap 138kV Caddo Mills Explorer (11832) – Scatter Branch Sub (1818) Line via (future) GEUS_STM Substation
- Location
- Hunt County, Texas
- Technology
- Gas: 104 MW
- Total requested
- 104 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 3 June 2025
- Proposed online date
- June 2027
Location
Marker shows the centre of Hunt County; the queue data does not give exact sites.
Other requests in Hunt County
- Pink SolarSolar · 152 MW · agreement signed
- 18-Bravo BESSBattery storage · 407 MW · in study
- Fermata BESSBattery storage · 204 MW · in study
- Ceres BESSBattery storage · 203 MW · in study
- McMurtre StorageBattery storage · 176 MW · in study
- Valdivian SolarSolar · 74.9 MW · in study
- Makalu SolarSolar · 50.2 MW · in study
- Turquoise StorageOther · 196 MW · built
- Signal SolarSolar · 51.8 MW · built
- Egret Hill StorageOther · 206 MW · withdrawn
- Hathor SolarSolar · 67.6 MW · withdrawn
- Hallmark SolarSolar · 43.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem