United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOT18-Bravo BESS
18-Bravo BESS is a 407 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Hunt County, Texas.
Queue statusIn planning
- PlanningQueued Apr 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Feb 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 28INR0327
- Grid region
- ERCOT (Texas)
- Developer
- Scout Energy Management, LLC
- Connection point (POI)
- 138 kV Commerce Switch Substation. Bus no. #1816
- Location
- Hunt County, Texas
- Technology
- Battery: 407 MW
- Total requested
- 407 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 1 April 2025
- Proposed online date
- February 2028
Location
Marker shows the centre of Hunt County; the queue data does not give exact sites.
Other requests in Hunt County
- Pink SolarSolar · 152 MW · agreement signed
- Fermata BESSBattery storage · 204 MW · in study
- Ceres BESSBattery storage · 203 MW · in study
- McMurtre StorageBattery storage · 176 MW · in study
- Power Lane II GasGas · 104 MW · in study
- Valdivian SolarSolar · 74.9 MW · in study
- Makalu SolarSolar · 50.2 MW · in study
- Turquoise StorageOther · 196 MW · built
- Signal SolarSolar · 51.8 MW · built
- Egret Hill StorageOther · 206 MW · withdrawn
- Hathor SolarSolar · 67.6 MW · withdrawn
- Hallmark SolarSolar · 43.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem