United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTMakalu Solar
Makalu Solar is a 50.2 MW solar request in interconnection study in the ERCOT interconnection queue, in Hunt County, Texas.
Queue statusIn planning
- PlanningQueued Jan 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 22INR0425
- Grid region
- ERCOT (Texas)
- Developer
- Abei Energy Green X LLC
- Connection point (POI)
- Tap 138kV 977 Pruitt - 971 Greenville
- Location
- Hunt County, Texas
- Technology
- Solar: 50.2 MW
- Total requested
- 50.2 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 21 January 2021
- Proposed online date
- July 2028
Location
Marker shows the centre of Hunt County; the queue data does not give exact sites.
Other requests in Hunt County
- Pink SolarSolar Β· 152 MW Β· agreement signed
- 18-Bravo BESSBattery storage Β· 407 MW Β· in study
- Fermata BESSBattery storage Β· 204 MW Β· in study
- Ceres BESSBattery storage Β· 203 MW Β· in study
- McMurtre StorageBattery storage Β· 176 MW Β· in study
- Power Lane II GasGas Β· 104 MW Β· in study
- Valdivian SolarSolar Β· 74.9 MW Β· in study
- Turquoise StorageOther Β· 196 MW Β· built
- Signal SolarSolar Β· 51.8 MW Β· built
- Egret Hill StorageOther Β· 206 MW Β· withdrawn
- Hathor SolarSolar Β· 67.6 MW Β· withdrawn
- Hallmark SolarSolar Β· 43.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem