United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Hathor Solar

Hathor Solar is a 67.6 MW solar request withdrawn in the ERCOT interconnection queue, in Hunt County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2020 (completed)
  2. Withdrawn / abandonedApr 2022 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
22INR0396
Grid region
ERCOT (Texas)
Developer
ABEI ENERGY & INFRASTRUCTURE
Connection point (POI)
Tap 138kV 960 Shelby - 811 Nevada
Location
Hunt County, Texas
Technology
Solar: 67.6 MW
Total requested
67.6 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
10 September 2020
Proposed online date
August 2023
Withdrawn
April 2022

Location

Marker shows the centre of Hunt County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hunt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem