United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTHallmark Solar
Hallmark Solar is a 43.0 MW solar request withdrawn in the ERCOT interconnection queue, in Hunt County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2016 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 18INR0056
- Grid region
- ERCOT (Texas)
- Developer
- Hallmark Solar, LLC
- Connection point (POI)
- tap 69kV 1824 Neyland - 1826 Cadmil
- Location
- Hunt County, Texas
- Technology
- Solar: 43.0 MW
- Total requested
- 43.0 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 14 December 2016
- Proposed online date
- May 2023
- Withdrawn
- October 2023
Location
Marker shows the centre of Hunt County; the queue data does not give exact sites.
Other requests in Hunt County
- Pink SolarSolar Β· 152 MW Β· agreement signed
- 18-Bravo BESSBattery storage Β· 407 MW Β· in study
- Fermata BESSBattery storage Β· 204 MW Β· in study
- Ceres BESSBattery storage Β· 203 MW Β· in study
- McMurtre StorageBattery storage Β· 176 MW Β· in study
- Power Lane II GasGas Β· 104 MW Β· in study
- Valdivian SolarSolar Β· 74.9 MW Β· in study
- Makalu SolarSolar Β· 50.2 MW Β· in study
- Turquoise StorageOther Β· 196 MW Β· built
- Signal SolarSolar Β· 51.8 MW Β· built
- Egret Hill StorageOther Β· 206 MW Β· withdrawn
- Hathor SolarSolar Β· 67.6 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem