Turquoise Storage is a 196 MW other request built and operating in the ERCOT interconnection queue, in Hunt County, Texas.
Request details
- Queue ID
- 22INR0509
- Grid region
- ERCOT (Texas)
- Developer
- BT Cunningham Storage, LLC
- Connection point (POI)
- 6950 Wallace Switch 138kV
- Location
- Hunt County, Texas
- Technology
- Other: 196 MW
- Total requested
- 196 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 17 March 2021
- Agreement signed
- 22 October 2021
- Proposed online date
- August 2023
- Came online
- July 2023
Location
Marker shows the centre of Hunt County; the queue data does not give exact sites.
Other requests in Hunt County
- Pink SolarSolar Β· 152 MW Β· agreement signed
- 18-Bravo BESSBattery storage Β· 407 MW Β· in study
- Fermata BESSBattery storage Β· 204 MW Β· in study
- Ceres BESSBattery storage Β· 203 MW Β· in study
- McMurtre StorageBattery storage Β· 176 MW Β· in study
- Power Lane II GasGas Β· 104 MW Β· in study
- Valdivian SolarSolar Β· 74.9 MW Β· in study
- Makalu SolarSolar Β· 50.2 MW Β· in study
- Signal SolarSolar Β· 51.8 MW Β· built
- Egret Hill StorageOther Β· 206 MW Β· withdrawn
- Hathor SolarSolar Β· 67.6 MW Β· withdrawn
- Hallmark SolarSolar Β· 43.0 MW Β· withdrawn