United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTEgret Hill Storage
Egret Hill Storage is a 206 MW other request withdrawn in the ERCOT interconnection queue, in Hunt County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedOct 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 21INR0519
- Grid region
- ERCOT (Texas)
- Developer
- Coyote Crossing LLC
- Connection point (POI)
- 837 DentSw 138kV
- Location
- Hunt County, Texas
- Technology
- Other: 206 MW
- Total requested
- 206 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Entered queue
- 1 September 2020
- Proposed online date
- October 2021
- Withdrawn
- October 2020
Location
Marker shows the centre of Hunt County; the queue data does not give exact sites.
Other requests in Hunt County
- Pink SolarSolar Β· 152 MW Β· agreement signed
- 18-Bravo BESSBattery storage Β· 407 MW Β· in study
- Fermata BESSBattery storage Β· 204 MW Β· in study
- Ceres BESSBattery storage Β· 203 MW Β· in study
- McMurtre StorageBattery storage Β· 176 MW Β· in study
- Power Lane II GasGas Β· 104 MW Β· in study
- Valdivian SolarSolar Β· 74.9 MW Β· in study
- Makalu SolarSolar Β· 50.2 MW Β· in study
- Turquoise StorageOther Β· 196 MW Β· built
- Signal SolarSolar Β· 51.8 MW Β· built
- Hathor SolarSolar Β· 67.6 MW Β· withdrawn
- Hallmark SolarSolar Β· 43.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem