United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA — page 116
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Aggie Solar Project SLF Solar + storage · reNRG TX 8 LLC |
104 MW | In study |
| Nelson Solar |
104 MW | In study |
| Battery storage project AH2-131, Gloucester County Battery storage |
104 MW | In study |
| Anawa La BESS Solar + storage · Anawa La Solar LLC |
104 MW | In study |
| Piedra BESS Solar + storage · Piedra Solar, LLC |
104 MW | Agreement signed |
| Bronze Quinta Storage Battery storage · KCE TX 28, LLC |
104 MW | In study |
| Diamond Cowboy Storage Battery storage · Diamond B Storage, LLC |
104 MW | In study |
| Solar project GEN-2017-068, Sumner County Solar |
104 MW | Agreement signed |
| Post Trail Energy Battery storage · Post Trail Energy, LLC |
104 MW | In study |
| Onshore wind project 13, Kittitas County Onshore wind |
104 MW | Agreement signed |
| Gatsby Energy Storage Battery storage · Gatsby Energy Storage LLC |
103 MW | In study |
| Three Ranches BESS Solar + storage · Three Ranches Energy LLC |
103 MW | In study |
| Rio Vista Storage Solar + storage · Rio Vista Storage, LLC |
103 MW | In study |
| Shallow Valley Storage Battery storage · Shallow Valley Storage, LLC |
103 MW | In study |
| Pequin Energy Storage Battery storage · Pequin Energy Storage, LLC |
103 MW | In study |
| Replace 103.1 MW of Heskett Units 1 & 2 with One (1) General Electric synchronous combustion turbine; Heskett 1 & 2 Gas |
103 MW | In study |
| Hyacinth Storage Battery storage · Hyacinth Storage, LLC |
103 MW | In study |
| Tioga Pass Battery storage |
103 MW | In study |
| Atticus Energy Storage Battery storage · Atticus Energy Storage |
103 MW | In study |
| Appaloosa Run BESS Battery storage · APPALOOSA RUN STORAGE, LLC |
103 MW | In study |
| Evans Creek Energy Storage Battery storage · Evans Creek Energy Storage LLC |
103 MW | In study |
| Onshore wind project GI-1401, Butte County Onshore wind |
103 MW | Agreement signed |
| Onshore wind project AI1-006, Randolph County Onshore wind |
103 MW | In study |
| Black Bear Solar Solar + storage · ESCONDIDO DRAW RESOURCES, LLC |
103 MW | In study |
| Massey Storage Battery storage · Massey Storage, LLC |
103 MW | In study |
| Wisdom BESS SLF Solar + storage · Wisdom Green Energy LLC |
103 MW | In study |
| Bonita Bateria Battery storage |
103 MW | In study |
| Third Coast BESS Battery storage · Third Coast BESS LLC |
103 MW | Agreement signed |
| Louisa Energy Storage Battery storage · VESI 49 LLC |
103 MW | Agreement signed |
| Oakdale Storage Battery storage |
103 MW | Agreement signed |
| Seven Flags BESS Battery storage · Seven Flags BESS LLC |
103 MW | Agreement signed |
| Firebird BESS Battery storage · TX BESS 6, LLC |
103 MW | In study |
| Tierra Seca BESS Battery storage · Tierra Seca BESS LLC |
103 MW | Agreement signed |
| Three Rivers Energy Center Gas |
103 MW | Agreement signed |
| Millennium Energy Storage Battery storage |
103 MW | Paused / redesign |
| Bexar ESS Battery storage · Bexar ESS LLC |
103 MW | Agreement signed |
| Solar project 20181030002, Charleston County Solar |
103 MW | In study |
| Solar project GEN-2017-100, Texas County Solar |
103 MW | Agreement signed |
| Madrone Energy Storage Battery storage |
103 MW | Paused / redesign |
| Estonian Storage Other · 249RD 8ME |
103 MW | Paused / redesign |
| Roost Energy Storage Battery storage · Bluff Creek Energy Storage LLC |
102 MW | In study |
| Holstein 2 Energy Storage Solar + storage · 229HD 8me LLC |
102 MW | In study |
| Amador Storage Battery storage · BT Amador Storage, LLC |
102 MW | Agreement signed |
| Solar project 734, Crook County Solar · Aurora Solar, LLC |
102 MW | Agreement signed |
| Los Nietos Battery storage |
102 MW | Agreement signed |
| Big Five Storage Battery storage · TX BESS 3 LLC |
102 MW | In study |
| Cassia Battery storage |
102 MW | In study |
| Arges BESS Battery storage |
102 MW | In study |
| Gas project GEN-2024-003, Franklin County Gas |
102 MW | In study |
| Prairie Horizon Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)