United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTEstonian Storage
Estonian Storage is a 103 MW other request suspended in the ERCOT interconnection queue, in Delta County, Texas.
Queue statusPaused / redesign
- PlanningQueued Jan 2020 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2022 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 22INR0291
- Grid region
- ERCOT (Texas)
- Developer
- 249RD 8ME
- Connection point (POI)
- 6834 Enloe Sw 138kV
- Location
- Delta County, Texas
- Technology
- Other: 103 MW
- Total requested
- 103 MW
- Study phase
- FIS
- Queue status
- Suspended
- Entered queue
- 29 January 2020
- Proposed online date
- December 2022
Location
Marker shows the centre of Delta County; the queue data does not give exact sites.
Other requests in Delta County
- Eagle Springs SolarSolar + storage Β· 77.2 MW Β· agreement signed
- Eagle Springs StorageSolar + storage Β· 33.1 MW Β· agreement signed
- Serengeti SolarSolar Β· 76.2 MW Β· in study
- Estonian SolarSolar Β· 203 MW Β· built
- Estonian StorageOther Β· 102 MW Β· built
- Estonian 2 SolarSolar Β· 102 MW Β· withdrawn
- Estonian SolarSolar Β· 102 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem