Estonian Solar

Estonian Solar is a 102 MW solar request withdrawn in the ERCOT interconnection queue, in Delta County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2019 (completed)
  2. Withdrawn / abandonedJun 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0340
Grid region
ERCOT (Texas)
Developer
249RD 8ME
Connection point (POI)
6834 Enloe Sw 138kV
Location
Delta County, Texas
Technology
Solar: 102 MW
Total requested
102 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
6 May 2019
Proposed online date
December 2022
Withdrawn
June 2020

Location

Marker shows the centre of Delta County; the queue data does not give exact sites.