United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA — page 117
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Blackland Prairie 1 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 6 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 2 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Edgewood BESS 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 1 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 3 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 4 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 4 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Solar project GEN-2021-027, Lancaster County Solar |
102 MW | In study |
| Blackland Prairie 2 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| watermelon 5 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Pioneer Path Energy Storage 3 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 8 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Prairie Horizon Energy Storage 2 Battery storage · Tempus Power management LLC |
102 MW | In study |
| Edgewood BESS 1 Battery storage · Tempus Power management LLC |
102 MW | In study |
| watermelon 7 energy storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Blackland Prairie 3 Energy Storage Battery storage · Tempus power management LLC |
102 MW | In study |
| Denali Energy Storage Battery storage |
102 MW | Agreement signed |
| San Bernard Solar II Solar · San Bernard Solar II, LLC |
102 MW | Paused / redesign |
| Two Rivers Solar Solar + storage |
102 MW | In study |
| Pajaro Valley Storage Battery storage |
102 MW | In study |
| Kyan Solar Solar |
102 MW | Agreement signed |
| Remy Jade III Power Station Gas · Remy Jade III Generating, LLC |
102 MW | Agreement signed |
| Battery storage project GEN-2025-SR7, Muskogee County Battery storage |
102 MW | In study |
| Opuntia Solar SLF Solar + storage · Opuntia Solar, LLC |
102 MW | In study |
| Crocus Solar Solar + storage · Crocus Solar, LLC |
102 MW | In study |
| Roxton Storage Solar + storage · Roxton Solar, LLC |
102 MW | In study |
| Hillandale Solar Solar · Hillandale Solar, LLC |
102 MW | Agreement signed |
| Half Moon 2 BESS Battery storage |
102 MW | Paused / redesign |
| Droga Battery storage |
102 MW | In study |
| Tokay Storage Battery storage |
102 MW | Agreement signed |
| Stoneridge BESS Battery storage · Stoneridge Solar, LLC |
102 MW | Agreement signed |
| Kurtz Solar SLF Solar + storage · Kurtz Solar, LLC |
102 MW | In study |
| Pisgah Ridge Solar 2 Solar + storage · Pisgah Ridge Solar 2, LLC |
102 MW | In study |
| Pamela Heights I Battery storage · Pamela heights I Energy Center LLC |
102 MW | Agreement signed |
| Myers Solar Solar + storage · BT Myers Solar, LLC |
102 MW | In study |
| Greyhound Solar - Phase F Solar · ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR |
102 MW | Agreement signed |
| Lucky 7 Solar Solar · Lucky 7 Solar Farm LLC |
102 MW | Agreement signed |
| Kennedy Solar Solar + storage · Kennedy Bypass Solar LLC |
102 MW | In study |
| Jayhawk Solar Solar · Renewable Energy Ventures, LLC |
102 MW | In study |
| Battery storage project GEN-2023-SR27, Mayes County Battery storage |
102 MW | In study |
| Lamkin Solar Solar · Commanche Solar, LLC |
102 MW | Agreement signed |
| Solar project GEN-2017-061, Mayes County Solar |
102 MW | Agreement signed |
| Gas project CS25-05, Kootenai County Gas |
102 MW | In study |
| Gas project CS25-04, Kootenai County Gas |
102 MW | In study |
| Triangle Ranch Delta Onshore wind |
102 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)