United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in the USA — page 117

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9,1872,001.0 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9,187 requests · page 117 of 184
ProjectCapacityStatusLocationRegionQueuedOnline
Blackland Prairie 1 Energy Storage
Battery storage · Tempus power management LLC
102 MWIn study Travis, TXERCOT Mar 2025target 2027
watermelon 6 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Feb 2025target 2029
watermelon 2 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
Edgewood BESS 2
Battery storage · Tempus Power management LLC
102 MWIn study Van Zandt, TXERCOT Jan 2025target 2028
Pioneer Path Energy Storage 1
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
watermelon 1 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
watermelon 3 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
Prairie Horizon Energy Storage 3
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Pioneer Path Energy Storage 2
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Pioneer Path Energy Storage 4
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
watermelon 4 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Jan 2025target 2029
Prairie Horizon Energy Storage 1
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Solar project GEN-2021-027, Lancaster County
Solar
102 MWIn study Lancaster, NESPP May 2021target 2026
Blackland Prairie 2 Energy Storage
Battery storage · Tempus power management LLC
102 MWIn study Travis, TXERCOT Mar 2025target 2027
watermelon 5 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Feb 2025target 2029
Pioneer Path Energy Storage 3
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
watermelon 8 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Feb 2025target 2029
Prairie Horizon Energy Storage 2
Battery storage · Tempus Power management LLC
102 MWIn study Robertson, TXERCOT Feb 2025target 2027
Edgewood BESS 1
Battery storage · Tempus Power management LLC
102 MWIn study Van Zandt, TXERCOT Nov 2024target 2028
watermelon 7 energy storage
Battery storage · Tempus power management LLC
102 MWIn study Dallas, TXERCOT Feb 2025target 2029
Blackland Prairie 3 Energy Storage
Battery storage · Tempus power management LLC
102 MWIn study Travis, TXERCOT Mar 2025target 2027
Denali Energy Storage
Battery storage
102 MWAgreement signed San Joaquin, CACAISO Apr 2020target 2028
San Bernard Solar II
Solar · San Bernard Solar II, LLC
102 MWPaused / redesign Wharton, TXERCOT Mar 2019target 2022
Two Rivers Solar
Solar + storage
102 MWIn study Camden, GASoutheast Mar 2022target 2027
Pajaro Valley Storage
Battery storage
102 MWIn study San Diego, CACAISO Apr 2021target 2030
Kyan Solar
Solar
102 MWAgreement signed Kern, CACAISO May 2016target 2027
Remy Jade III Power Station
Gas · Remy Jade III Generating, LLC
102 MWAgreement signed Harris, TXERCOT Jul 2022target 2028
Battery storage project GEN-2025-SR7, Muskogee County
Battery storage
102 MWIn study Muskogee, OKSPP May 2025target 2026
Opuntia Solar SLF
Solar + storage · Opuntia Solar, LLC
102 MWIn study Refugio, TXERCOT Aug 2021target 2028
Crocus Solar
Solar + storage · Crocus Solar, LLC
102 MWIn study Stephens, TXERCOT Jan 2025target 2028
Roxton Storage
Solar + storage · Roxton Solar, LLC
102 MWIn study Lamar, TXERCOT Nov 2024target 2028
Hillandale Solar
Solar · Hillandale Solar, LLC
102 MWAgreement signed Pittsylvania, VAPJM Mar 2019target 2030
Half Moon 2 BESS
Battery storage
102 MWPaused / redesign Hidalgo, TXERCOT Mar 2022
Droga
Battery storage
102 MWIn study Merced, CACAISO Apr 2023target 2028
Tokay Storage
Battery storage
102 MWAgreement signed Santa Clara, CACAISO Apr 2021target 2030
Stoneridge BESS
Battery storage · Stoneridge Solar, LLC
102 MWAgreement signed Milam, TXERCOT Mar 2023target 2026
Kurtz Solar SLF
Solar + storage · Kurtz Solar, LLC
102 MWIn study Atascosa, TXERCOT Sep 2024target 2029
Pisgah Ridge Solar 2
Solar + storage · Pisgah Ridge Solar 2, LLC
102 MWIn study Navarro, TXERCOT Jul 2021target 2026
Pamela Heights I
Battery storage · Pamela heights I Energy Center LLC
102 MWAgreement signed Harris, TXERCOT Sep 2024target 2026
Myers Solar
Solar + storage · BT Myers Solar, LLC
102 MWIn study Bee, TXERCOT Jun 2023target 2028
Greyhound Solar - Phase F
Solar · ROCKHOUND SOLAR 2 LLC DBA GREYHOUND SOLAR
102 MWAgreement signed Ector, TXERCOT Apr 2025target 2025
Lucky 7 Solar
Solar · Lucky 7 Solar Farm LLC
102 MWAgreement signed Hopkins, TXERCOT Mar 2024target 2027
Kennedy Solar
Solar + storage · Kennedy Bypass Solar LLC
102 MWIn study Navarro, TXERCOT Mar 2022target 2028
Jayhawk Solar
Solar · Renewable Energy Ventures, LLC
102 MWIn study Mitchell, TXERCOT Aug 2019target 2025
Battery storage project GEN-2023-SR27, Mayes County
Battery storage
102 MWIn study Mayes, OKSPP Jul 20232024
Lamkin Solar
Solar · Commanche Solar, LLC
102 MWAgreement signed Comanche, TXERCOT Jun 2019target 2027
Solar project GEN-2017-061, Mayes County
Solar
102 MWAgreement signed Mayes, OKSPP May 20172025
Gas project CS25-05, Kootenai County
Gas
102 MWIn study Kootenai, IDWest Apr 2025target 2029
Gas project CS25-04, Kootenai County
Gas
102 MWIn study Kootenai, IDWest Apr 2025target 2027
Triangle Ranch Delta
Onshore wind
102 MWPaused / redesign Cottle, TXERCOT Sep 2022target 2025
Page 117 of 184

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)