United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Post Trail Energy

Post Trail Energy is a 104 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Matagorda County, Texas.

Queue statusIn planning
  1. PlanningQueued Sep 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
26INR0429
Grid region
ERCOT (Texas)
Developer
Post Trail Energy, LLC
Connection point (POI)
Tap 138kV Conoco 8138 - Black Cat 80124
Location
Matagorda County, Texas
Technology
Battery: 104 MW
Total requested
104 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
10 September 2024
Proposed online date
October 2028

Location

Marker shows the centre of Matagorda County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Matagorda County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem