Requests shown9,1872,001.0 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9,187 requests · page 182 of 184
ProjectCapacityStatusLocationRegionQueuedOnline
Battery storage project 561350, Fairfield County
Battery storage
4.6 MWUnder construction Fairfield, SCSoutheast Jun 2022target 2025
Berkshire Wind Increase
Onshore wind
4.6 MWAgreement signed Berkshire, MAISO-NE Aug 2012target 2019
Solar + storage project 440, Lewis And Clark County
Solar + storage
4.6 MWIn study Lewis And Clark, MTWest Jan 2023target 2023
Solar + storage project AI1-129, Lycoming County
Solar + storage
4.5 MWIn study Lycoming, PAPJM Sep 2022target 2024
Other project hist_q71, Stevens County
Other
4.5 MWPaused / redesign Stevens, WAWest
Solar + storage project AI1-127, Dauphin County
Solar + storage
4.5 MWIn study Dauphin, PAPJM Sep 2022target 2024
Hydro project GI-2020-18, Mesa County
Hydro
4.5 MWAgreement signed Mesa, COWest Dec 2020target 2022
Lassen Lodge Hydroelectric
Hydro
4.5 MWAgreement signed Tehama, CACAISO Mar 2011target 2027
Solar project 956532, Florence County
Solar
4.5 MWIn study Florence, SCSoutheast Jun 2024
Solar project AI2-308, Bedford County
Solar
4.4 MWIn study Bedford, PAPJM Mar 2023target 2024
Solar project 752, Malheur County
Solar · Fry Foods Inc.
4.2 MWAgreement signed Malheur, ORWest Aug 2024target 2025
Gas project J3756, Marquette County
Gas
4.2 MWIn study Marquette, MIMISO Apr 2024target 2019
Battery storage project 976447, Mecklenburg County
Battery storage
4.1 MWIn study Mecklenburg, NCSoutheast Jun 2025
Solar project GI-2009-7, Alamosa County
Solar
4.0 MWAgreement signed Alamosa, COWest May 2009target 2010
Solar project 968543, Dillon County
Solar
4.0 MWIn study Dillon, SCSoutheast Jan 2025
Cedar Lane Solar
Solar
4.0 MWAgreement signed Queen Anne's, MDPJM Oct 2015target 2026
Solar project 977896, Cleveland County
Solar
4.0 MWIn study Cleveland, NCSoutheast Jun 2025
Hydro project 659, Loudon County
Hydro
4.0 MWIn study Loudon, TNSoutheast Oct 2024target 2028
Solar project AI2-018, Somerset County
Solar
4.0 MWIn study Somerset, PAPJM Dec 2022target 2026
Hydro project J1826, Dakota County
Hydro
4.0 MWIn study Dakota, MNMISO Sep 2022target 2024
Greenfield CSG 1
Solar
4.0 MWPaused / redesign Erie, PAPJM Sep 2020target 2025
RHC Solar
Solar + storage
3.9 MWAgreement signed Somerset, MDPJM Apr 2020target 2024
Springfield CSG 1
Solar
3.9 MWPaused / redesign Delaware, PAPJM Sep 2020target 2024
Battery storage project 889853, Vance County
Battery storage
3.6 MWUnder construction Vance, NCSoutheast Jun 2023
Geothermal project T2-012, Beaver County
Geothermal
3.6 MWIn study Beaver, UTWest Aug 2025target 2025
Other project AH2-001, Susquehanna County
Other
3.6 MWIn study Susquehanna, PAPJM Oct 2021target 2023
Solar project 957223, Johnston County
Solar
3.6 MWIn study Johnston, NCSoutheast Jul 2024
Solar + storage project IC-1199, Lowndes County
Solar + storage
3.5 MWAgreement signed Lowndes, GASoutheast Nov 2023target 2025
Solar project AH2-095, Crawford County
Solar
3.3 MWIn study Crawford, PAPJM Jan 2022target 2022
Roadrunner Crossing Wind (Uprate)
Wind + storage · Roadrunner Wind, LLC
3.3 MWIn study Eastland, TXERCOT Dec 2025target 2026
Solar project 977878, Marion County
Solar
3.2 MWIn study Marion, SCSoutheast Jun 2025
Rio Nogales CT1 Rotor Replacement
Gas · CPS Energy
3.1 MWAgreement signed Guadalupe, TXERCOT target 2025
CPS Rio Nogales CT301 Rotor Replacement
Gas · CPS Energy
3.1 MWAgreement signed Guadalupe, TXERCOT Jul 2023target 2025
CPS Rio Nogales CT201 Rotor Replacement
Gas · CPS Energy
3.1 MWAgreement signed Guadalupe, TXERCOT target 2025
Battery storage project 977422, Pender County
Battery storage
3.1 MWIn study Pender, NCSoutheast Jun 2025
Surplus; Petersburg
Other
3.0 MWIn study Pike, INMISO May 2022target 2023
Solar + storage project AH2-181, Mercer County
Solar + storage
3.0 MWIn study Mercer, PAPJM Mar 2022target 2024
Hydro project 658, Loudon County
Hydro
3.0 MWIn study Loudon, TNSoutheast Oct 2024target 2028
Solar project C3-148, Crook County
Solar · CP Prineville, LLC
3.0 MWIn study Crook, ORWest May 2023target 2033
Milpa Power Bank
Battery storage
3.0 MWIn study Santa Clara, CACAISO Apr 2018target 2025
Hydro project J3219, Dakota County
Hydro
3.0 MWIn study Dakota, MNMISO Sep 2022target 2023
Sweetwater 1 repower
Onshore wind · Leeward Energy
3.0 MWAgreement signed Nolan, TXERCOT Feb 2018target 2024
Solar project G1003, Adams County
Solar
3.0 MWIn study Adams, WAWest Nov 2023target 2025
Solar project 968482, Anderson County
Solar
3.0 MWIn study Anderson, SCSoutheast Jan 2025
Solar project AH2-024, Jefferson County
Solar
3.0 MWIn study Jefferson, PAPJM Oct 2021target 2023
Other project 894253, Cleveland County
Other
2.8 MWUnder construction Cleveland, NCSoutheast Jan 2000
GGC Solar
Solar + storage
2.7 MWAgreement signed Dorchester, MDPJM Mar 2020target 2024
Battery storage project 563202, Burke County
Battery storage
2.7 MWUnder construction Burke, NCSoutheast Jun 2022target 2026
Great Lake Growers
Solar
2.6 MWPaused / redesign Erie, PAPJM Sep 2020target 2024
Solar project 972410, Anderson County
Solar
2.5 MWIn study Anderson, SCSoutheast Mar 2025
Page 182 of 184

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)