United States › Grid › Interconnection queues › Texas
WIND + STORAGE · ERCOTRoadrunner Crossing Wind (Uprate)
Roadrunner Crossing Wind (Uprate) is a 3.3 MW wind + storage request in interconnection study in the ERCOT interconnection queue, in Eastland County, Texas.
Queue statusIn planning
- PlanningQueued Dec 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 26INR0726
- Grid region
- ERCOT (Texas)
- Developer
- Roadrunner Wind, LLC
- Connection point (POI)
- 68051 Reata 345kV
- Location
- Eastland County, Texas
- Technology
- Wind: 3.3 MW · Battery
- Total requested
- 3.3 MW
- Study phase
- SS Started, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 23 December 2025
- Proposed online date
- June 2026
Location
Marker shows the centre of Eastland County; the queue data does not give exact sites.
Other requests in Eastland County
- Anchor Wind IIIOnshore wind · 16.0 MW · agreement signed
- Silver Star repowerOnshore wind · -7.2 MW · agreement signed
- Damia SolarSolar + storage · 306 MW · in study
- Basketflower SolarSolar + storage · 183 MW · in study
- Damia StorageSolar + storage · 153 MW · in study
- Star Grass Renewable Energy Solar SLFSolar + storage · 150 MW · in study
- Basketflower StorageSolar + storage · 92.0 MW · in study
- Anchor Wind IIOnshore wind · 129 MW · built
- Roadrunner Crossing Wind SLFWind + storage · 128 MW · built
- Roadrunner Crossing Wind II SLFOnshore wind · 127 MW · built
- Anchor WindOnshore wind · 98.9 MW · built
- Anchor BESSOther · 71.5 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem