ONSHORE WIND · ERCOTAnchor Wind III
Anchor Wind III is a 16.0 MW onshore wind request with a signed interconnection agreement in the ERCOT interconnection queue, in Eastland County, Texas.
Queue statusConsented
- PlanningQueued Dec 2021 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Dec 2025 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 21INR0546
- Grid region
- ERCOT (Texas)
- Developer
- RANCHLAND WIND PROJECT LLC
- Connection point (POI)
- 345 kV Aspire Station (68011)
- Location
- Eastland County, Texas
- Technology
- Wind: 16.0 MW
- Total requested
- 16.0 MW
- Study phase
- SS Completed, FIS Completed, IA
- Queue status
- Active
- Entered queue
- 3 December 2021
- Proposed online date
- December 2025
Location
Marker shows the centre of Eastland County; the queue data does not give exact sites.
Other requests in Eastland County
- Silver Star repowerOnshore wind · -7.2 MW · agreement signed
- Damia SolarSolar + storage · 306 MW · in study
- Basketflower SolarSolar + storage · 183 MW · in study
- Damia StorageSolar + storage · 153 MW · in study
- Star Grass Renewable Energy Solar SLFSolar + storage · 150 MW · in study
- Basketflower StorageSolar + storage · 92.0 MW · in study
- Roadrunner Crossing Wind (Uprate)Wind + storage · 3.3 MW · in study
- Anchor Wind IIOnshore wind · 129 MW · built
- Roadrunner Crossing Wind SLFWind + storage · 128 MW · built
- Roadrunner Crossing Wind II SLFOnshore wind · 127 MW · built
- Anchor WindOnshore wind · 98.9 MW · built
- Anchor BESSOther · 71.5 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem