United States › Grid › Interconnection queues › Texas
ONSHORE WIND · ERCOTSilver Star repower
Silver Star repower is a -7.2 MW onshore wind request with a signed interconnection agreement in the ERCOT interconnection queue, in Eastland County, Texas.
Queue statusConsented
- PlanningQueued Apr 2017 (completed)
- ConsentedOct 2018 (current stage)
- Construction (not yet reached)
- OperatingTarget Dec 2025 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 18INR0064
- Grid region
- ERCOT (Texas)
- Developer
- Silver Star I Power Partners, LLC
- Connection point (POI)
- 1642 Flat Creek 138kV
- Location
- Eastland County, Texas
- Technology
- Wind: -7.2 MW
- Total requested
- -7.2 MW
- Study phase
- SS Completed, FIS Completed, IA
- Queue status
- Active
- Entered queue
- 5 April 2017
- Agreement signed
- 16 October 2018
- Proposed online date
- December 2025
Location
Marker shows the centre of Eastland County; the queue data does not give exact sites.
Other requests in Eastland County
- Anchor Wind IIIOnshore wind · 16.0 MW · agreement signed
- Damia SolarSolar + storage · 306 MW · in study
- Basketflower SolarSolar + storage · 183 MW · in study
- Damia StorageSolar + storage · 153 MW · in study
- Star Grass Renewable Energy Solar SLFSolar + storage · 150 MW · in study
- Basketflower StorageSolar + storage · 92.0 MW · in study
- Roadrunner Crossing Wind (Uprate)Wind + storage · 3.3 MW · in study
- Anchor Wind IIOnshore wind · 129 MW · built
- Roadrunner Crossing Wind SLFWind + storage · 128 MW · built
- Roadrunner Crossing Wind II SLFOnshore wind · 127 MW · built
- Anchor WindOnshore wind · 98.9 MW · built
- Anchor BESSOther · 71.5 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem