United States › Grid › Interconnection queues › Maryland

SOLAR + STORAGE · PJM

GGC Solar

GGC Solar is a 2.7 MW solar + storage request with a signed interconnection agreement in the PJM interconnection queue, in Dorchester County, Maryland, connecting to DPL.

Queue statusConsented
  1. PlanningQueued Mar 2020 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2024 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
AF2-378
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
DPL
Connection point (POI)
Cambridge 12 kV
Location
Dorchester County, Maryland
Technology
Solar: 2.7 MW · Battery
Total requested
2.7 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Wholesale Market P
Queue status
Active
Entered queue
31 March 2020
Proposed online date
March 2024

Location

Marker shows the centre of Dorchester County; the queue data does not give exact sites.

Power plants in Maryland · Transmission lines in Maryland

Other requests in Dorchester County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem