United States βΊ Grid βΊ Interconnection queues βΊ Maryland
SOLAR Β· PJMSolar project AG2-181, Dorchester County
Solar project AG2-181, Dorchester County is a 28.0 MW solar request withdrawn in the PJM interconnection queue, in Dorchester County, Maryland, connecting to DPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2025 (completed)
- Withdrawn / abandonedDec 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-181
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- DPL
- Developer
- Old Line Energy, LLC
- Connection point (POI)
- Airey - Golden Hill 69 kV
- Location
- Dorchester County, Maryland
- Technology
- Solar: 28.0 MW
- Total requested
- 28.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 3 March 2025
- Proposed online date
- June 2024
- Withdrawn
- December 2025
Location
Marker shows the centre of Dorchester County; the queue data does not give exact sites.
Other requests in Dorchester County
- Egypt Road SolarSolar Β· 51.1 MW Β· agreement signed
- SBC SolarSolar + storage Β· 10.0 MW Β· agreement signed
- GGC SolarSolar + storage Β· 2.7 MW Β· agreement signed
- Solar project AH2-096, Dorchester CountySolar Β· 19.5 MW Β· in study
- New Market SolarSolar Β· 50.0 MW Β· suspended
- Richfield Solar and StorageSolar Β· 50.0 MW Β· built
- Constellation Solar Maryland II, LLC Solar FacilitySolar Β· 3.4 MW Β· built
- Gas project G28, Dorchester CountyGas Β· 390 MW Β· withdrawn
- Battery storage project AF2-409, Dorchester CountyBattery storage Β· 100 MW Β· withdrawn
- Choptank Solar and StorageSolar Β· 100 MW Β· withdrawn
- Solar project AE2-209, Dorchester CountySolar Β· 56.0 MW Β· withdrawn
- Solar project AG2-592, Dorchester CountySolar Β· 28.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem