🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Milpa Power Bank

Milpa Power Bank is a 3.0 MW battery storage request in interconnection study in the CAISO interconnection queue, in Santa Clara County, California, connecting to PGAE.

Queue statusIn planning
  1. PlanningQueued Apr 2018 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Apr 2025 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
1457
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Los Esteros 115 kV
Location
Santa Clara County, California
Technology
Battery: 3.0 MW
Total requested
3.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Active
Entered queue
16 April 2018
Proposed online date
April 2025

Location

Marker shows the centre of Santa Clara County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Santa Clara County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem