United States › Grid › Interconnection queues › California

BATTERY STORAGE · CAISO

Creekside

Creekside is a 418 MW battery storage request withdrawn in the CAISO interconnection queue, in Santa Clara County, California, connecting to PGAE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandonedMay 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1271
Grid region
CAISO (California)
Utility / transmission owner
PGAE
Connection point (POI)
Moss Landing - Metcalf 230 kV line
Location
Santa Clara County, California
Technology
Battery: 418 MW
Total requested
418 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
2 May 2016
Proposed online date
December 2020
Withdrawn
May 2017

Location

Marker shows the centre of Santa Clara County; the queue data does not give exact sites.

Power plants in California · Transmission lines in California

Other requests in Santa Clara County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem