United States › Grid › Interconnection queues › California
BATTERY STORAGE · CAISOJackrabbit Power Bank
Jackrabbit Power Bank is a 308 MW battery storage request in interconnection study in the CAISO interconnection queue, in Santa Clara County, California, connecting to PGAE.
- PlanningQueued Apr 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 2263
- Grid region
- CAISO (California)
- Utility / transmission owner
- PGAE
- Connection point (POI)
- LOS ESTEROS 115 kV
- Location
- Santa Clara County, California
- Technology
- Battery: 308 MW
- Total requested
- 308 MW
- Service type
- Network resource (NRIS)
- Study phase
- Caiso Cluster 15 Unvalidated
- Queue status
- Active
- Entered queue
- 17 April 2023
- Proposed online date
- June 2029
Location
Marker shows the centre of Santa Clara County; the queue data does not give exact sites.
Power plants in California · Transmission lines in California
Other requests in Santa Clara County
- Jewelflower StorageBattery storage · 355 MW · agreement signed
- Tanager StorageBattery storage · 200 MW · agreement signed
- Ajo Power BankBattery storage · 124 MW · agreement signed
- Los Esteros Critical Energy Facility ExpansionGas · 123 MW · agreement signed
- Tokay StorageBattery storage · 102 MW · agreement signed
- Hummingbird Energy StorageBattery storage · 75.0 MW · agreement signed
- Kifer BESS 1Battery storage · 50.0 MW · in study
- Milpa Power BankBattery storage · 3.0 MW · in study
- DoloresBattery storage · 510 MW · withdrawn
- Ada Energy StorageBattery storage · 505 MW · withdrawn
- CreeksideBattery storage · 418 MW · withdrawn
- HillRichBattery storage · 309 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem