United States › Grid › Interconnection queues › North Carolina
SOLAR · SOUTHEASTSolar project 957223, Johnston County
Solar project 957223, Johnston County is a 3.6 MW solar request in interconnection study in the Southeast interconnection queue, in Johnston County, North Carolina, connecting to Duke Energy Progress.
- PlanningQueued Jul 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 957223
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Connection point (POI)
- Powhatan Industrial 230kV station
- Location
- Johnston County, North Carolina
- Technology
- Solar: 3.6 MW
- Total requested
- 3.6 MW
- Service type
- Other
- Study phase
- Phase 3 Cluster Study - Study Complete
- Queue status
- Active
- Entered queue
- 9 July 2024
Location
Marker shows the centre of Johnston County; the queue data does not give exact sites.
Power plants in North Carolina · Transmission lines in North Carolina
Other requests in Johnston County
- Solar project 955167, Johnston CountySolar · 73.0 MW · under construction
- Other project 897247, Johnston CountyOther · 30.5 MW · under construction
- Other project 897773, Johnston CountyOther · 10.0 MW · under construction
- Gas project 31968, Johnston CountyGas · 602 MW · withdrawn
- Solar project 569234, Johnston CountySolar · 51.7 MW · withdrawn
- Solar project 26829, Johnston CountySolar · 50.0 MW · withdrawn
- Solar project 957452, Johnston CountySolar · 3.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem