SOLAR Β· SOUTHEASTSolar project 26829, Johnston County
Solar project 26829, Johnston County is a 50.0 MW solar request withdrawn in the Southeast interconnection queue, in Johnston County, North Carolina, connecting to Duke Energy Progress.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 26829
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Progress
- Developer
- Masked
- Connection point (POI)
- Selma-Four Oaks 230kV
- Location
- Johnston County, North Carolina
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 26 December 2018
Location
Marker shows the centre of Johnston County; the queue data does not give exact sites.
Power plants in North Carolina Β· Transmission lines in North Carolina
Other requests in Johnston County
- Solar project 955167, Johnston CountySolar Β· 73.0 MW Β· under construction
- Other project 897247, Johnston CountyOther Β· 30.5 MW Β· under construction
- Other project 897773, Johnston CountyOther Β· 10.0 MW Β· under construction
- Solar project 957223, Johnston CountySolar Β· 3.6 MW Β· in study
- Gas project 31968, Johnston CountyGas Β· 602 MW Β· withdrawn
- Solar project 569234, Johnston CountySolar Β· 51.7 MW Β· withdrawn
- Solar project 957452, Johnston CountySolar Β· 3.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem