United States › Grid › Interconnection queues › South Carolina

BATTERY STORAGE · SOUTHEAST

Battery storage project 561350, Fairfield County

Battery storage project 561350, Fairfield County is a 4.6 MW battery storage request under construction in the Southeast interconnection queue, in Fairfield County, South Carolina, connecting to Duke Energy Carolinas.

Queue statusUnder construction
  1. PlanningQueued Jun 2022 (completed)
  2. Consented (completed)
  3. Construction (current stage)
  4. OperatingTarget Sep 2025 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
561350
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Carolinas
Connection point (POI)
Longtown Ret
Location
Fairfield County, South Carolina
Technology
Battery: 4.6 MW
Total requested
4.6 MW
Service type
Other
Study phase
Construction - Pending
Queue status
Active
Entered queue
1 June 2022
Proposed online date
September 2025

Location

Marker shows the centre of Fairfield County; the queue data does not give exact sites.

Power plants in South Carolina · Transmission lines in South Carolina

Other requests in Fairfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem