United States › Grid › Interconnection queues › South Carolina
GAS · SOUTHEASTGas project 20211118002, Fairfield County
Gas project 20211118002, Fairfield County is a 57.8 MW gas request in interconnection study in the Southeast interconnection queue, in Fairfield County, South Carolina, connecting to Dominion Energy South Carolina.
- Planning (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Mar 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 20211118002
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Dominion Energy South Carolina
- Developer
- DESC - Generation
- Connection point (POI)
- Parr Steam Plant 115 kV Substation
- Location
- Fairfield County, South Carolina
- Technology
- Gas: 57.8 MW
- Total requested
- 57.8 MW
- Service type
- NRIS and ERIS
- Study phase
- Cluster Study
- Queue status
- Active
- Proposed online date
- March 2025
Location
Marker shows the centre of Fairfield County; the queue data does not give exact sites.
Power plants in South Carolina · Transmission lines in South Carolina
Other requests in Fairfield County
- Battery storage project 561350, Fairfield CountyBattery storage · 4.6 MW · under construction
- Solar project 20250929001, Fairfield CountySolar · 75.0 MW · in study
- Solar project 287, Fairfield CountySolar · 29.7 MW · in study
- Nuclear project 15, Fairfield CountyNuclear · 318 MW · built
- Solar + storage project 20211119001, Fairfield CountySolar + storage · 115 MW · withdrawn
- Solar project 20171018002, Fairfield CountySolar · 100 MW · withdrawn
- Solar project 20171018003, Fairfield CountySolar · 100 MW · withdrawn
- Solar project 66, Fairfield CountySolar · 100 MW · withdrawn
- Solar project 20171018004, Fairfield CountySolar · 100 MW · withdrawn
- Solar project 273, Fairfield CountySolar · 74.9 MW · withdrawn
- Solar + storage project 20180508001, Fairfield CountySolar + storage · 54.0 MW · withdrawn
- Solar project 95, Fairfield CountySolar · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem