United States βΊ Grid βΊ Interconnection queues βΊ South Carolina
SOLAR Β· SOUTHEASTSolar project 95, Fairfield County
Solar project 95, Fairfield County is a 50.0 MW solar request withdrawn in the Southeast interconnection queue, in Fairfield County, South Carolina, connecting to Santee Cooper.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2018 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 95
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Santee Cooper
- Location
- Fairfield County, South Carolina
- Technology
- Solar: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 26 April 2018
- Proposed online date
- December 2020
Location
Marker shows the centre of Fairfield County; the queue data does not give exact sites.
Power plants in South Carolina Β· Transmission lines in South Carolina
Other requests in Fairfield County
- Battery storage project 561350, Fairfield CountyBattery storage Β· 4.6 MW Β· under construction
- Solar project 20250929001, Fairfield CountySolar Β· 75.0 MW Β· in study
- Gas project 20211118002, Fairfield CountyGas Β· 57.8 MW Β· in study
- Solar project 287, Fairfield CountySolar Β· 29.7 MW Β· in study
- Nuclear project 15, Fairfield CountyNuclear Β· 318 MW Β· built
- Solar + storage project 20211119001, Fairfield CountySolar + storage Β· 115 MW Β· withdrawn
- Solar project 20171018002, Fairfield CountySolar Β· 100 MW Β· withdrawn
- Solar project 20171018003, Fairfield CountySolar Β· 100 MW Β· withdrawn
- Solar project 66, Fairfield CountySolar Β· 100 MW Β· withdrawn
- Solar project 20171018004, Fairfield CountySolar Β· 100 MW Β· withdrawn
- Solar project 273, Fairfield CountySolar Β· 74.9 MW Β· withdrawn
- Solar + storage project 20180508001, Fairfield CountySolar + storage Β· 54.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem