United States › Grid › Interconnection queues › Indiana

OTHER · MISO

Surplus; Petersburg

Surplus; Petersburg is a 3.0 MW other request in interconnection study in the MISO interconnection queue, in Pike County, Indiana, connecting to DUKE ENERGY INDIANA.

Queue statusIn planning
  1. PlanningQueued May 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2023 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
S1022
Grid region
MISO (Midcontinent)
Utility / transmission owner
DUKE ENERGY INDIANA
Connection point (POI)
PETEUA31 4.14kV
Location
Pike County, Indiana
Technology
Solar: 3.0 MW · Other
Total requested
3.0 MW
Queue status
Active
Entered queue
2 May 2022
Proposed online date
October 2023

Location

Marker shows the centre of Pike County; the queue data does not give exact sites.

Power plants in Indiana · Transmission lines in Indiana

Other requests in Pike County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem