United States › Grid › Interconnection queues › Texas
GAS · ERCOTRio Nogales CT1 Rotor Replacement
Rio Nogales CT1 Rotor Replacement is a 3.1 MW gas request with a signed interconnection agreement in the ERCOT interconnection queue, in Guadalupe County, Texas.
Queue statusConsented
- Planning (completed)
- ConsentedJan 2023 (current stage)
- Construction (not yet reached)
- OperatingTarget Dec 2025 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 23INR0483
- Grid region
- ERCOT (Texas)
- Developer
- CPS Energy
- Connection point (POI)
- Rio Nogales Substation 5362 RIONOG 345kV
- Location
- Guadalupe County, Texas
- Technology
- Gas: 3.1 MW
- Total requested
- 3.1 MW
- Study phase
- IA Executed
- Queue status
- Active
- Agreement signed
- 20 January 2023
- Proposed online date
- December 2025
Location
Marker shows the centre of Guadalupe County; the queue data does not give exact sites.
Other requests in Guadalupe County
- Rockridge SolarSolar · 211 MW · agreement signed
- Nockenut Springs Solar 2Solar · 203 MW · agreement signed
- Nockenut Springs Solar 1Solar · 203 MW · agreement signed
- CPS Rio Nogales CT301 Rotor ReplacementGas · 3.1 MW · agreement signed
- CPS Rio Nogales CT201 Rotor ReplacementGas · 3.1 MW · agreement signed
- Calpine Guadalupe PeakersGas · 450 MW · in study
- Guadalupe Battery Storage ProjectBattery storage · 211 MW · in study
- Ruedrich BESSBattery storage · 201 MW · in study
- Aster SolarSolar · 161 MW · in study
- Roble BESSBattery storage · 154 MW · in study
- Utica SolarSolar · 205 MW · suspended
- Utica BESSBattery storage · 204 MW · suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem