SOLAR Β· ERCOTUtica Solar
Utica Solar is a 205 MW solar request suspended in the ERCOT interconnection queue, in Guadalupe County, Texas.
Queue statusPaused / redesign
- PlanningQueued Apr 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- Operating (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 23INR0192
- Grid region
- ERCOT (Texas)
- Location
- Guadalupe County, Texas
- Technology
- Solar: 205 MW
- Total requested
- 205 MW
- Queue status
- Suspended
- Entered queue
- 20 April 2021
Location
Marker shows the centre of Guadalupe County; the queue data does not give exact sites.
Other requests in Guadalupe County
- Rockridge SolarSolar Β· 211 MW Β· agreement signed
- Nockenut Springs Solar 2Solar Β· 203 MW Β· agreement signed
- Nockenut Springs Solar 1Solar Β· 203 MW Β· agreement signed
- Rio Nogales CT1 Rotor ReplacementGas Β· 3.1 MW Β· agreement signed
- CPS Rio Nogales CT301 Rotor ReplacementGas Β· 3.1 MW Β· agreement signed
- CPS Rio Nogales CT201 Rotor ReplacementGas Β· 3.1 MW Β· agreement signed
- Calpine Guadalupe PeakersGas Β· 450 MW Β· in study
- Guadalupe Battery Storage ProjectBattery storage Β· 211 MW Β· in study
- Ruedrich BESSBattery storage Β· 201 MW Β· in study
- Aster SolarSolar Β· 161 MW Β· in study
- Roble BESSBattery storage Β· 154 MW Β· in study
- Utica BESSBattery storage Β· 204 MW Β· suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem