United States › Grid › Interconnection queues › Pennsylvania
OTHER · PJMOther project AH2-001, Susquehanna County
Other project AH2-001, Susquehanna County is a 3.6 MW other request in interconnection study in the PJM interconnection queue, in Susquehanna County, Pennsylvania, connecting to PENELEC.
- PlanningQueued Oct 2021 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2023 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- AH2-001
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Rattlesnake Hill Waste Heat Recovery
- Location
- Susquehanna County, Pennsylvania
- Technology
- Other: 3.6 MW
- Total requested
- 3.6 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Active
- Entered queue
- 1 October 2021
- Proposed online date
- December 2023
Location
Marker shows the centre of Susquehanna County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Susquehanna County
- Solar project AH2-189, Susquehanna CountySolar · 12.0 MW · in study
- Roundtop Energy ProjectGas · 3.5 MW · built
- Roundtop Energy ProjectsGas · 1.5 MW · built
- Roundtop Energy ProjectGas · 1.0 MW · built
- Solar + storage project AH1-419, Susquehanna CountySolar + storage · 20.0 MW · withdrawn
- Thompson 34.5kVGas · 19.9 MW · withdrawn
- Gas project AB1-083, Susquehanna CountyGas · 19.9 MW · withdrawn
- Gas project AA2-112, Susquehanna CountyGas · 19.9 MW · withdrawn
- Gas project AB1-084, Susquehanna CountyGas · 19.9 MW · withdrawn
- Solar project AG2-294, Susquehanna CountySolar · 18.0 MW · withdrawn
- Solar project AG2-293, Susquehanna CountySolar · 18.0 MW · withdrawn
- Solar project AG2-291, Susquehanna CountySolar · 16.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem