🔌 EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more → Skip to main content

United States › Grid › Interconnection queues › Pennsylvania

GAS · PJM

Roundtop Energy Project

Roundtop Energy Project is a 1.0 MW gas request built and operating in the PJM interconnection queue, in Susquehanna County, Pennsylvania, connecting to PENELEC.

Queue statusOperating
  1. PlanningQueued Apr 2014 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2016 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Z2-103
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PENELEC
Connection point (POI)
North Meshoppen 34.5kV III
Location
Susquehanna County, Pennsylvania
Technology
Gas: 1.0 MW
Total requested
1.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
30 April 2014
Proposed online date
December 2016
Came online
January 2016

Location

Marker shows the centre of Susquehanna County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Susquehanna County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem