United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
SOLAR Β· PJMSolar project AG2-293, Susquehanna County
Solar project AG2-293, Susquehanna County is a 18.0 MW solar request withdrawn in the PJM interconnection queue, in Susquehanna County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2021 (completed)
- Withdrawn / abandonedAug 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG2-293
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Williams Potter Tap 115 kV
- Location
- Susquehanna County, Pennsylvania
- Technology
- Solar: 18.0 MW
- Total requested
- 18.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 22 March 2021
- Proposed online date
- December 2023
- Withdrawn
- August 2024
Location
Marker shows the centre of Susquehanna County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Susquehanna County
- Solar project AH2-189, Susquehanna CountySolar Β· 12.0 MW Β· in study
- Other project AH2-001, Susquehanna CountyOther Β· 3.6 MW Β· in study
- Roundtop Energy ProjectGas Β· 3.5 MW Β· built
- Roundtop Energy ProjectsGas Β· 1.5 MW Β· built
- Roundtop Energy ProjectGas Β· 1.0 MW Β· built
- Solar + storage project AH1-419, Susquehanna CountySolar + storage Β· 20.0 MW Β· withdrawn
- Thompson 34.5kVGas Β· 19.9 MW Β· withdrawn
- Gas project AB1-083, Susquehanna CountyGas Β· 19.9 MW Β· withdrawn
- Gas project AA2-112, Susquehanna CountyGas Β· 19.9 MW Β· withdrawn
- Gas project AB1-084, Susquehanna CountyGas Β· 19.9 MW Β· withdrawn
- Solar project AG2-294, Susquehanna CountySolar Β· 18.0 MW Β· withdrawn
- Solar project AG2-291, Susquehanna CountySolar Β· 16.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem