GEOTHERMAL · WESTGeothermal project T2-012, Beaver County
Geothermal project T2-012, Beaver County is a 3.6 MW geothermal request in interconnection study in the West interconnection queue, in Beaver County, Utah, connecting to PacifiCorp.
Queue statusIn planning
- PlanningQueued Aug 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2025 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- T2-012
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- PacifiCorp
- Connection point (POI)
- Circuit SCM11 out of School Mine substation
- Location
- Beaver County, Utah
- Technology
- Geothermal: 3.6 MW
- Total requested
- 3.6 MW
- Service type
- Energy only (ERIS)
- Queue status
- Active
- Entered queue
- 29 August 2025
- Proposed online date
- December 2025
Location
Marker shows the centre of Beaver County; the queue data does not give exact sites.
Other requests in Beaver County
- Solar project 634, Beaver CountySolar · 99.0 MW · agreement signed
- Battery storage project S0008, Beaver CountyBattery storage · 80.0 MW · agreement signed
- Battery storage project S0007, Beaver CountyBattery storage · 80.0 MW · agreement signed
- Battery storage project S0009, Beaver CountyBattery storage · 80.0 MW · agreement signed
- Solar project 631, Beaver CountySolar · 99.0 MW · built
- Solar project 551, Beaver CountySolar · 80.0 MW · built
- Solar project 515, Beaver CountySolar · 80.0 MW · built
- Solar project 516, Beaver CountySolar · 80.0 MW · built
- Geothermal project 313, Beaver CountyGeothermal · 25.0 MW · built
- Geothermal project 66, Beaver CountyGeothermal · 15.0 MW · built
- Geothermal project 415, Beaver CountyGeothermal · 11.0 MW · built
- Other project 333, Beaver CountyOther · 3.2 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem