GEOTHERMAL · WEST

Geothermal project 415, Beaver County

Geothermal project 415, Beaver County is a 11.0 MW geothermal request built and operating in the West interconnection queue, in Beaver County, Utah, connecting to PacifiCorp.

Queue statusOperating
  1. PlanningQueued Mar 2012 (completed)
  2. ConsentedAug 2012 (completed)
  3. Construction (completed)
  4. OperatingTarget Apr 2013 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
415
Grid region
West (non-ISO utilities)
Utility / transmission owner
PacifiCorp
Developer
Thermo No. 1 BE-01, LLC
Connection point (POI)
Circuit, SML21, out of South Milford substation
Location
Beaver County, Utah
Technology
Geothermal: 11.0 MW
Total requested
11.0 MW
Service type
Energy only (ERIS)
Study phase
IA signed 8/6/12
Queue status
Operational
Entered queue
12 March 2012
Agreement signed
6 August 2012
Proposed online date
April 2013

Location

Marker shows the centre of Beaver County; the queue data does not give exact sites.

Power plants in Utah · Transmission lines in Utah

Other requests in Beaver County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem