United States › Grid › Interconnection queues

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in the USA — page 22

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown9,1872,001.0 GW
Active in queue2,001.0 GW9,187 requests
Agreement signed423.2 GW2,141 requests
Withdrawn24,2054,519.8 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

9,187 requests · page 22 of 184
ProjectCapacityStatusLocationRegionQueuedOnline
Shoals Energy Storage
Battery storage
409 MWAgreement signed Ventura, CACAISO Apr 2020target 2030
Battery storage project Q2413, Pinal County
Battery storage
409 MWIn study Pinal, AZWest Feb 2024target 2027
Beacon Storage
Battery storage · AES Distributed Energy, Inc
409 MWIn study Harris, TXERCOT May 2021target 2029
Solar + storage project J1263, Clark County
Solar + storage
409 MWAgreement signed Clark, ILMISO Apr 2019target 2025
Sigma Storage
Battery storage · AES Distributed Energy, Inc
408 MWIn study Harris, TXERCOT May 2021target 2029
Dragan Storage
Solar + storage · Hecate Grid Dragan Storage LLC
408 MWIn study Comanche, TXERCOT Aug 2020target 2026
Solstice C
Solar + storage
408 MWIn study Fresno, CACAISO Apr 2023target 2031
Gas project AH1-711, Wood County
Gas · Troy Energy, LLC
408 MWIn study Wood, OHPJM Apr 2025
Hidalgo Energy Storage
Battery storage
408 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2033
Solstice D
Solar + storage
408 MWIn study Fresno, CACAISO Apr 2023target 2031
Grasshopper Solar
Solar · Grasshopper Solar LLC
408 MWIn study Haskell, TXERCOT Sep 2021target 2028
Rough Hat 2
Solar + storage
408 MWAgreement signed Clark, NVCAISO Apr 2020target 2027
Lund Storage Center 1
Battery storage · Lund Storage Center 1, LLC
408 MWIn study Bastrop, TXERCOT Jan 2023target 2026
Clarkson
Solar + storage
408 MWAgreement signed Fresno, CACAISO Apr 2021target 2029
18-Bravo BESS
Battery storage · Scout Energy Management, LLC
407 MWIn study Hunt, TXERCOT Apr 2025target 2028
Maravillosa 1
Solar + storage
407 MWIn study Kings, CACAISO Apr 2023target 2029
Caliche Mound Solar
Solar · Tierra Blanco Solar LLC
407 MWAgreement signed Deaf Smith, TXERCOT Jul 2020target 2026
West Lorain Power Plant 345 kV
Gas
406 MWAgreement signed Lorain, OHPJM Sep 2020target 2031
Lotus Solar 2
Solar + storage
406 MWIn study Madera, CACAISO Apr 2021target 2030
Claire BESS
Battery storage · BRP Blue Topaz 3, LLC
406 MWIn study Harris, TXERCOT Feb 2023target 2027
Simon
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Gabriel Storage
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2033
Trolley
Battery storage
406 MWAgreement signed San Bernardino, CACAISO Apr 2021target 2031
Coral Reef
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Compadre Solar
Solar · Hill Solar I, LLC
406 MWAgreement signed Hill, TXERCOT Mar 2021target 2025
Fleetwood
Battery storage
406 MWIn study Los Angeles, CACAISO Apr 2021target 2032
Marici
Battery storage
406 MWAgreement signed Los Angeles, CACAISO Apr 2021target 2031
Ulysses Crossing Solar
Solar
405 MWPaused / redesign Coleman, TXERCOT Sep 2024
Two Step Solar
Solar · Two Step Solar, LLC
405 MWIn study Ellis, TXERCOT Dec 2025target 2029
Merom Storage
Solar + storage · Hoosier Energy / Solvenz
405 MWIn study Sullivan, INMISO Dec 2025target 2028
Tea Leaf Energy Storage
Battery storage
404 MWIn study Alameda, CACAISO Apr 2023target 2030
Rough Hat Hybrid Solar
Solar + storage
404 MWAgreement signed Nye, NVCAISO Apr 2019target 2028
Dirac
Battery storage
403 MWIn study San Bernardino, CACAISO Apr 2021target 2031
Big Rooter West Solar
Solar + storage · Big Rooter West, LLC
403 MWAgreement signed Robertson, TXERCOT Mar 2024target 2028
Gas project IC-1160, Shelby County
Gas
403 MWPaused / redesign Shelby, ALSoutheast Aug 2023target 2030
Gas project IC-1159, Shelby County
Gas
403 MWPaused / redesign Shelby, ALSoutheast Aug 2023target 2030
Hittson Creek Solar
Solar + storage · 174 Power Global Properties
403 MWIn study Callahan, TXERCOT Dec 2024target 2028
Solarville Solar SLF
Solar + storage · Ville Solar, LLC
403 MWIn study Kaufman, TXERCOT May 2024target 2028
Bernice Energy Storage
Battery storage · Bernice Energy Storage LLC
403 MWIn study Bexar, TXERCOT Sep 2024target 2027
Bluefox Solar 1
Solar · Industrial November Project LLC
403 MWIn study Matagorda, TXERCOT Mar 2024target 2029
Merope BESS
Battery storage · BRP Merope BESS LLC
402 MWIn study Comanche, TXERCOT Dec 2021target 2028
Smith Lake Solar DC
Solar + storage · Smith Lake Solar
402 MWIn study Grimes, TXERCOT Feb 2022target 2028
Onshore wind project IA-PNM-2016-02, Torrance Cty County
Onshore wind · Pacific Wind Development
402 MWAgreement signed Torrance Cty, NMWest May 2016target 2020
Iron Belt Energy Storage
Battery storage · Iron Belt Energy Storage Project, LLC
402 MWAgreement signed Borden, TXERCOT Jan 2023target 2027
Bluefox Solar 2
Solar · Industrial November Project LLC
402 MWIn study Matagorda, TXERCOT Mar 2024target 2030
Mineral Basin Solar Power
Solar · Mineral Basin Solar Power, LLC
402 MWIn study Clearfield, PANYISO Aug 2020target 2028
Infinium Solar
Solar · Jackalope Flats Solar, LLC
402 MWIn study Howard, TXERCOT Aug 2024target 2029
Bottom Grass Solar II
Solar + storage · Flint Rock Solar Project, LLC
402 MWIn study Colorado, TXERCOT Nov 2022target 2028
Corruscant BESS
Battery storage · AEU Battery Project III LLC
402 MWIn study Dickens, TXERCOT Feb 2024target 2027
Onshore wind project 09-035, Gilliam County
Onshore wind
401 MWPaused / redesign Gilliam, ORWest Jul 2009target 2013
Page 22 of 184

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)