United States › Grid › Interconnection queues
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA — page 56
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Battery storage project IC-1187, Wilkinson County Battery storage |
220 MW | Agreement signed |
| Solar project J3418, Sangamon County Solar |
220 MW | In study |
| Eastern Cottontail Solar Solar |
220 MW | Agreement signed |
| Onshore wind project J3496, Sanilac County Onshore wind |
220 MW | In study |
| Solar project J3495, Greene County Solar |
220 MW | In study |
| Solar project J2444, Van Buren County Solar |
220 MW | In study |
| Replacing 220 MW of coal generation with BESS; Trenton Channel 9 Other |
220 MW | In study |
| Battery storage project GEN-2025-SR8, Noble County Battery storage |
220 MW | In study |
| Onshore wind project GEN-2024-346, Nowata County Onshore wind |
220 MW | In study |
| Battery storage project J3646, St. Clair County Battery storage |
220 MW | In study |
| Solar project J2001, Newaygo County Solar |
220 MW | In study |
| Solar project GEN-2024-257, Pratt County Solar |
220 MW | In study |
| Solar project J4050, Jefferson Davis Parish County Solar |
220 MW | In study |
| Solar project J4041, Menard County Solar |
220 MW | In study |
| Solar project J2814, Kalamazoo County Solar |
220 MW | In study |
| Solar + storage project G1070, Columbia County Solar + storage |
220 MW | In study |
| Crowded Star Solar Solar + storage · Jones City Solar, LLC |
219 MW | Agreement signed |
| Gas project 113, Lewis County Gas |
219 MW | Paused / redesign |
| Gas project Company QF, Humboldt County Gas |
218 MW | In study |
| Gas project Company QG, Humboldt County Gas |
218 MW | In study |
| Sepanta Solar Solar · BREG - Belgian Renewable Energy Group |
217 MW | In study |
| Two Barbaras BESS Battery storage · Two Barbaras BESS |
217 MW | Agreement signed |
| Pez Rojo BESS Battery storage · Pez Rojo BESS, LLC |
217 MW | In study |
| Maratua Solar Solar · BDPU Solar Maratua, LLC |
217 MW | Paused / redesign |
| Gas project GEN-2023-225, Lancaster County Gas |
217 MW | In study |
| Gas project ERAS-2025-002, Hale County Gas |
217 MW | In study |
| Marcos Solar SLF Solar + storage · GRS BESS Texas Eight |
216 MW | In study |
| Solar project J2599, Redwood County Solar |
216 MW | In study |
| Walleye Solar Solar · Sandow Lakes Ranch Solar II, LLC |
215 MW | In study |
| Onshore wind project GEN-2017-233, Grady County Onshore wind |
215 MW | Agreement signed |
| Solar project J3457, Arkansas County Solar |
215 MW | In study |
| Gas project 114, Kitsap County Gas |
215 MW | Paused / redesign |
| Onshore wind project GEN-2022-176, Nowata County Onshore wind |
215 MW | In study |
| Solar project J2611, Alcona County Solar |
215 MW | In study |
| Solar + storage project GEN-2020-013, Harlan County Solar + storage |
215 MW | In study |
| Onshore wind project GEN-2018-082, Pittsburg County Onshore wind |
215 MW | Agreement signed |
| Diamond Sage Solar 1 Solar + storage · DGC Renewables, LLC |
214 MW | In study |
| Diamond Sage Solar 2 Solar + storage · DGC Renewables, LLC |
214 MW | In study |
| Solar project J3940, Isabella County Solar |
214 MW | In study |
| Puerto Del Sol 2 Solar · PUERTO DEL SOL, LLC |
214 MW | In study |
| Solar + storage project Q239, Pinal County Solar + storage |
214 MW | In study |
| Solar + storage project SP106, Pinal County Solar + storage |
214 MW | In study |
| Puerto Del Sol 1 Solar · PUERTO DEL SOL, LLC |
214 MW | In study |
| Dorian Storage Battery storage |
214 MW | Agreement signed |
| Zeus BESS Battery storage |
214 MW | Agreement signed |
| Weston Storage Battery storage |
214 MW | In study |
| Sandhill Energy Storage Battery storage · Xcel Energy |
214 MW | In study |
| Frigatebird Storage Battery storage |
214 MW | In study |
| Deckerville Solar Park Project Solar · DTE Electric |
213 MW | In study |
| Gas project 11-045, Multnomah County Gas |
213 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)