Sepanta Solar

Sepanta Solar is a 217 MW solar request in interconnection study in the ERCOT interconnection queue, in Nolan County, Texas.

Queue statusIn planning
  1. PlanningQueued Oct 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
23INR0473
Grid region
ERCOT (Texas)
Developer
BREG - Belgian Renewable Energy Group
Connection point (POI)
1339 ESKOTA_9 138kV (PSS/E BUS #1339, Station Name: ESKOTA_8, kV: 138 kV) Property is adjacent (West) to the Oncor Sweetwater Eskota Switch #1339. POI would simply be on the other side of the fence
Location
Nolan County, Texas
Technology
Solar: 217 MW
Total requested
217 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
18 October 2022
Proposed online date
September 2029

Location

Marker shows the centre of Nolan County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Nolan County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem