United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Maratua Solar

Maratua Solar is a 217 MW solar request suspended in the ERCOT interconnection queue, in Grimes County, Texas.

Queue statusPaused / redesign
  1. PlanningQueued Dec 2020 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Mar 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
22INR0471
Grid region
ERCOT (Texas)
Developer
BDPU Solar Maratua, LLC
Connection point (POI)
Tap 345kV 44645 Singleton β€šΓ„Γ¬ 44660 Skains Ckt 74
Location
Grimes County, Texas
Technology
Solar: 217 MW
Total requested
217 MW
Study phase
FIS
Queue status
Suspended
Entered queue
2 December 2020
Proposed online date
March 2029

Location

Marker shows the centre of Grimes County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Grimes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem