OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in the USA — page 63
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Staccato BESS Battery storage · Staccato Storage, LLC |
202 MW | In study |
| Bluefox Solar 3 Solar · Industrial November Project LLC |
202 MW | In study |
| Everest Energy Storage Battery storage |
202 MW | In study |
| Altair Energy Storage Battery storage · Altair Energy Storage |
202 MW | In study |
| Dodd Solar I Solar · Forest Grove Solar LLC |
202 MW | Agreement signed |
| Donegal Solar Solar · HE-Cottonwood Solar LLC |
202 MW | Agreement signed |
| Soda Lake Solar 2 SLF Solar + storage · Crane II Solar Electric, LLC |
202 MW | Agreement signed |
| Avant Prairie BESS Battery storage · Avant Prairie ESS LLC |
202 MW | In study |
| Mitchell Plant Road Storage Battery storage |
202 MW | Paused / redesign |
| Spurland Solar II Solar · Spurland Solar II |
202 MW | In study |
| Texas Cotton Solar Solar · RWE Solar Development, LLC |
202 MW | In study |
| Goldeneye BESS Battery storage · Black Mountain Energy Storage II |
202 MW | Agreement signed |
| Solar project GEN-2018-132, Pierce County Solar |
202 MW | Agreement signed |
| Solar + storage project GEN-2020-020, Mccurtain County Solar + storage |
202 MW | Agreement signed |
| Onshore wind project GEN-2017-004, Cloud County Onshore wind |
202 MW | Agreement signed |
| Stoneridge Solar Solar · Stoneridge Solar, LLC |
202 MW | Agreement signed |
| Solar project GEN-2017-226, Sedgwick County Solar |
202 MW | Agreement signed |
| Mesteno Wind Onshore wind · Mesteno Windpower, LLC |
202 MW | Agreement signed |
| OCI Cobb Creek ESS Solar + storage · Hillsboro Solar Project LLC |
202 MW | Agreement signed |
| Cattleman Wind A Onshore wind · RWE Renewables Development, LLC |
202 MW | Paused / redesign |
| Battery storage project GEN-2017-227, Sedgwick County Battery storage |
202 MW | Agreement signed |
| Solar project GEN-2017-220, Sedgwick County Solar |
202 MW | Agreement signed |
| Cattleman Wind B Onshore wind · RWE Renewables Development, LLC |
202 MW | Paused / redesign |
| Solar project GEN-2021-107, Pottawatomie County Solar |
202 MW | In study |
| Mitchell Plant Road Solar Solar |
202 MW | Paused / redesign |
| Thomas Cameron BESS Battery storage · Thomas Cameron BESS LLC |
202 MW | Agreement signed |
| Sun Angel ESS Battery storage · Sun Angel ESS LLC |
202 MW | In study |
| Corvus Solar Solar · Corvus Solar, LLC |
202 MW | Agreement signed |
| Soluce Cotton Storage Solar + storage · CTPB1,LLC |
202 MW | In study |
| Tri-X Solar 1 SLF Solar + storage · Crane I Solar Electric, LLC |
202 MW | Agreement signed |
| Tex-Bar ESS Battery storage · Tex-Bar ESS LLC |
202 MW | In study |
| Padua Grid BESS Unit 3 Battery storage · Padua Grid 3, LLC |
201 MW | Agreement signed |
| Exodus BESS Battery storage · Exodus Solar LLC |
201 MW | In study |
| Sawtooth Solar Solar · Sawtooth Solar, LLC |
201 MW | In study |
| Padrino Solar Solar · Hill Solar II, LLC |
201 MW | Agreement signed |
| Nockenut Springs Solar 3 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Desert Palm BESS Battery storage · Desert Palm BESS LLC |
201 MW | In study |
| El Molino Solar SLF Solar + storage · El Molino Solar, LLC |
201 MW | In study |
| Caladium BESS Battery storage · Caladium Storage, LLC |
201 MW | In study |
| Snap Jaw BESS Other · Moccasin Pointe Grid, LLC |
201 MW | Paused / redesign |
| Finch Storage Battery storage · Finch Storage, LLC |
201 MW | In study |
| Tucana BESS Battery storage · BRP Tucana BESS LLC |
201 MW | In study |
| Rush ESS Battery storage · OCI Solar Power LLC |
201 MW | In study |
| Eldora BESS Solar + storage · Eldora Energy LLC |
201 MW | Agreement signed |
| Nockenut Springs Solar 5 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Nockenut Springs Solar 4 Solar · Pecan Springs Energy, LLC |
201 MW | In study |
| Echols Grove, LLC Solar · Echols Grove, LLC |
201 MW | Agreement signed |
| Savannah Oaks Solar Solar · Savannah Oaks Solar Project LLC |
201 MW | In study |
| Wintergarden BESS Battery storage · Wintergarden BESS LLC |
201 MW | In study |
| Spinosa BESS Battery storage · Spinosa Energy Center, LLC |
201 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)1,857 · 519.1 GW
- ERCOT (Texas)1,986 · 447.3 GW
- MISO (Midcontinent)1,646 · 350.1 GW
- CAISO (California)429 · 188.6 GW
- Southeast (non-ISO utilities)1,067 · 161.4 GW
- SPP (Southwest Power Pool)692 · 152.4 GW
- PJM (Mid-Atlantic, Midwest)1,248 · 140.4 GW
- NYISO (New York)190 · 27.1 GW
- ISO-NE (New England)72 · 14.6 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)