United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas — page 42
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Abilene Elmcreek BESS Battery storage · DGSP2 LLC |
9.9 MW | Agreement signed |
| SE Edinburg BESS Battery storage · SBESS TX16 LLC |
9.9 MW | Agreement signed |
| County Road BESS Battery storage · County Rd Infra LLC |
9.9 MW | Agreement signed |
| Abilene Industrial Park BESS Battery storage · Distributed Generation Solutions LLC |
9.9 MW | Agreement signed |
| Blue Summit repower Onshore wind |
9.9 MW | Paused / redesign |
| Cedro Hill Wind Repower Onshore wind · CEDRO HILL WIND LLC |
9.9 MW | Agreement signed |
| Hidden Lakes BESS Battery storage · SBESS TX 6 LLC |
9.9 MW | Agreement signed |
| Elm Street BESS Battery storage · Elm St Infra LLC |
9.9 MW | Agreement signed |
| Hollywood Solar Repower Solar · RED TAILED HAWK SOLAR LLC |
9.9 MW | Agreement signed |
| BESS Stadium Battery storage · Grenergy USA |
9.9 MW | Agreement signed |
| Gears BESS Battery storage · Regis Gears-Harris LLC |
9.9 MW | Agreement signed |
| Apple BESS Battery storage · Apple Infra LLC |
9.9 MW | Agreement signed |
| Highway 6 BESS Battery storage · Hwy 6 Infra LLC |
9.9 MW | Agreement signed |
| Palmview BESS Battery storage · SBESS TX14 LLC |
9.9 MW | Agreement signed |
| Buda BESS Battery storage · Buda Infra LLC |
9.9 MW | Agreement signed |
| Hidden Valley BESS Battery storage · Regis Hidden Valley, LLC |
9.9 MW | Agreement signed |
| Lyssy BESS Battery storage · Regis Lyssy LLC |
9.9 MW | Agreement signed |
| Mesquite BESS Battery storage · Grenergy USA |
9.9 MW | Agreement signed |
| Cedarvale Gas Gas · RPC Merchant LLC |
9.9 MW | Agreement signed |
| Milton BESS Battery storage · Regis Milton LLC |
9.9 MW | Agreement signed |
| Torrecillas BESS Battery storage · Torrecillas Interconnect, LLC |
9.9 MW | Agreement signed |
| Cotulla BESS 1 Battery storage · SBESS TX19 LLC |
9.9 MW | Agreement signed |
| Utopia BESS Battery storage · Regis Utopia, LLC |
9.8 MW | Agreement signed |
| Medina Lake BESS Battery storage · Regis Medina Lake LLC |
9.8 MW | Agreement signed |
| Indian Mesa repower Onshore wind · Nextera |
9.3 MW | Agreement signed |
| Panther Creek 2 Repower Onshore wind · Panther Creek Wind Farm I&II, LLC |
8.0 MW | In study |
| Sweetwater 2 repower Onshore wind · Leeward Energy |
7.3 MW | Agreement signed |
| Desert Sky repower Onshore wind · DESERT SKY WIND FARM LLC |
7.2 MW | Agreement signed |
| Trent repower Onshore wind · TRENT WIND FARM LLC |
6.4 MW | Agreement signed |
| Roadrunner Crossing Wind (Uprate) Wind + storage · Roadrunner Wind, LLC |
3.3 MW | In study |
| Rio Nogales CT1 Rotor Replacement Gas · CPS Energy |
3.1 MW | Agreement signed |
| CPS Rio Nogales CT301 Rotor Replacement Gas · CPS Energy |
3.1 MW | Agreement signed |
| CPS Rio Nogales CT201 Rotor Replacement Gas · CPS Energy |
3.1 MW | Agreement signed |
| Sweetwater 1 repower Onshore wind · Leeward Energy |
3.0 MW | Agreement signed |
| Ashra Storage SLF Solar + storage · Ashra Solar, LLC |
1.6 MW | In study |
| Kickstart Energy Storage IV Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage III Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage I Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Kickstart Energy Storage II Battery storage · Kickstart Infrastructure LLC |
1.4 MW | In study |
| Champion Wind Repower Onshore wind · Champion Wind Farm, LLC |
0.3 MW | Agreement signed |
| Silver Star repower Onshore wind · Silver Star I Power Partners, LLC |
-7.2 MW | Agreement signed |
| Sherbino II Wind repower Onshore wind · Sherbino II Wind Farm LLC |
-18.0 MW | Agreement signed |
| Trinity Hills Wind repower Onshore wind · Trinity Hills Wind Farm LLC |
-27.0 MW | Agreement signed |
| Giga Austin Solar Solar · GIGA TEXAS ENERGY LLC |
-53.3 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,976 · 447.2 GW
- SPP (Southwest Power Pool)79 · 20.6 GW
- MISO (Midcontinent)27 · 6,659 MW
- West (non-ISO utilities)12 · 1,947 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)