United States › Grid › Interconnection queues › Texas

BATTERY STORAGE · ERCOT

Kickstart Energy Storage II

Kickstart Energy Storage II is a 1.4 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Ellis County, Texas.

Queue statusIn planning
  1. PlanningQueued Mar 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
27INR0470
Grid region
ERCOT (Texas)
Developer
Kickstart Infrastructure LLC
Connection point (POI)
Tap 345 kV 1907 Venus Switch - 3383 BYNUM_5
Location
Ellis County, Texas
Technology
Battery: 1.4 MW
Total requested
1.4 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
24 March 2025
Proposed online date
September 2029

Location

Marker shows the centre of Ellis County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Ellis County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem