BATTERY STORAGE · ERCOT

Abilene Industrial Park BESS

Abilene Industrial Park BESS is a 9.9 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Taylor County, Texas.

Queue statusConsented
  1. PlanningQueued Sep 2024 (completed)
  2. Consented (current stage)
  3. Construction (not yet reached)
  4. OperatingTarget Jan 2026 (not yet reached)
  5. Closed (not yet reached)

Request details

Queue ID
25INR0702
Grid region
ERCOT (Texas)
Developer
Distributed Generation Solutions LLC
Connection point (POI)
Station Name: Abilene Industrial Park TSP Station Code: ABINDUST Load Transformer name: LOAD1 Bus#: 60772 Voltage in kV (Transmission Level): 138kV
Location
Taylor County, Texas
Technology
Battery: 9.9 MW
Total requested
9.9 MW
Study phase
MRD Approved
Queue status
Active
Entered queue
12 September 2024
Proposed online date
January 2026

Location

Marker shows the centre of Taylor County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Taylor County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem