United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTAbilene Elmcreek BESS
Abilene Elmcreek BESS is a 9.9 MW battery storage request with a signed interconnection agreement in the ERCOT interconnection queue, in Taylor County, Texas.
Queue statusConsented
- PlanningQueued Sep 2024 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Jan 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 25INR0701
- Grid region
- ERCOT (Texas)
- Developer
- DGSP2 LLC
- Connection point (POI)
- Station Name: Abilene Elm Creek TSP Station Code: ELMCRK Load Transformer name: LOAD1 Bus#: 6255 Voltage in kV (Transmission Level): 138kV
- Location
- Taylor County, Texas
- Technology
- Battery: 9.9 MW
- Total requested
- 9.9 MW
- Study phase
- MRD Approved
- Queue status
- Active
- Entered queue
- 12 September 2024
- Proposed online date
- January 2026
Location
Marker shows the centre of Taylor County; the queue data does not give exact sites.
Other requests in Taylor County
- Buffalo Gap 3 Wind RepowerOnshore wind · 169 MW · agreement signed
- Horse13 CallD repowerOnshore wind · 44.0 MW · agreement signed
- HHGT repower Horse13+CallDOnshore wind · 44.0 MW · agreement signed
- Abilene Industrial Park BESSBattery storage · 9.9 MW · agreement signed
- Dog Star Solar IISolar · 503 MW · in study
- Dog Star Solar ISolar · 503 MW · in study
- Forts Trail BESSSolar + storage · 209 MW · in study
- Forts Trail BESS 2Solar + storage · 206 MW · in study
- Taylor County Paul StorageBattery storage · 205 MW · in study
- Forts Trail SolarSolar + storage · 201 MW · in study
- Chimney Rock BESSBattery storage · 156 MW · in study
- Summerhill BESSBattery storage · 143 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem